Earlier this year, we decided to remodel some areas of the house. The start is with the master bathroom. The pictures below are representative of what's been going on
This was our Master Bathroom Tub Area on July 25th
This was the evening of July 25th. The whole bathroom was stripped
On July 26th, they built the new frame for the new Jacuzzi
On July 28th, the new Jacuzzi was installed. The rest of the bathroom is being prepared for the tiles.